In short
A weather app tells you the weather. This forecast checks whether that weather suits a specific job. For each of the next 7 days it tests every possible start time against the project’s limits for temperature, humidity, dew point, wind and rain, both while you work and in the hours after you finish, and reports the best window as Good, Maybe or No with the reasons. The data is the hourly National Weather Service forecast in the U.S. and the MET Norway forecast in Canada, the UK and Europe. Try it on the home page, or read the plain-language guide to the best weather for outdoor projects.
All outdoor project weather rules at a glance
These are the exact limits each project forecast uses. They are taken from typical product labels and technical data sheets and, for concrete, from the American Concrete Institute’s hot- and cold-weather guides. “Ideal” values separate a Good day from a Maybe. Values outside the required range make the day a No.
| Project | Work window | Temperature while working | After you finish | Humidity & dew point | Wind | Rain |
|---|---|---|---|---|---|---|
| Stain a deck | 3 h, start 9 AM–2 PM | 50–90°F (ideal 55–85°F) | 40°F+ for 12 h; ideally 50°F+ for 12 h; no dew for 4 h | RH ≤ 85%; 5°F+ above dew point | ≤ 15 mph | 24 h dry before; 24 h dry after (48 h better) |
| Paint outside | 4 h, start 9 AM–1 PM | 35–90°F (ideal 50–85°F) | 35°F+ for 8 h; ideally 50°F+ for 8 h; no dew for 4 h | RH ≤ 85% (ideal ≤ 75%); 5°F+ above dew point | ≤ 15 mph | 24 h dry before; 12 h dry after (24 h better) |
| Pour concrete | 4 h, start 6 AM–12 PM | 40–100°F (ideal 50–90°F) | no freeze for 48 h; ideally 40°F+ for 72 h | — | ≤ 30 mph | 8 h dry after (24 h better) |
| Seal a driveway | 3 h, start 10 AM–1 PM | 50–95°F (ideal 60–90°F) | 50°F+ for 24 h | RH ≤ 90% | ≤ 25 mph | 24 h dry before; 24 h dry after (48 h better) |
| Spray weed killer | 1 h, start 7 AM–6 PM | 45–90°F (ideal 60–85°F) | — | — | 3–10 mph, gusts < 15 | 3 h dry before; 6 h dry after |
| Fertilize the lawn | 1 h, start 7 AM–6 PM | 40–95°F (ideal 50–85°F) | — | — | ≤ 20 mph | 0.1–0.75" within 48 h helps; 1"+ in 24 h is a No |
| Pressure wash | 3 h, start 9 AM–3 PM | 40–105°F (ideal 50–95°F) | ideally no freeze for 12 h | — | ≤ 25 mph | Rain while working only |
| Epoxy a garage floor | 3 h, start 9 AM–1 PM | 50–90°F (ideal 60–85°F) | 45°F+ for 24 h; ideally 55°F+ for 24 h | RH ≤ 85% (ideal ≤ 75%); 5°F+ above dew point | — | Rain while working only |
| Caulk outside | 2 h, start 9 AM–4 PM | 40–100°F (ideal 50–90°F) | — | 5°F+ above dew point | ≤ 25 mph | 12 h dry before; 6 h dry after (24 h better) |
| Spray paint outside | 1 h, start 9 AM–5 PM | 50–90°F (ideal 60–85°F) | — | RH ≤ 85% (ideal ≤ 65%); 5°F+ above dew point | ≤ 10 mph | 6 h dry after (12 h better) |
Your product label always takes priority. A low-temperature paint, a rain-ready stain or a fast-setting concrete mix can have different limits.
Where the forecast data comes from
In the United States the forecasts use the public API of the U.S. National Weather Service (NOAA), the same forecast behind weather.gov. In Canada, the UK, Ireland and the rest of Europe they use the free forecast API of MET Norway, the Norwegian Meteorological Institute, which covers the whole world and is licensed under CC BY 4.0. When you enter a location:
- ZIP code to location: the 5-digit ZIP code is matched to the center of its ZIP Code Tabulation Area from the U.S. Census Bureau gazetteer, covering about 33,800 ZIP codes in all 50 states. Outside the U.S., postcodes and towns are matched with GeoNames data (CC BY 4.0): UK outward codes such as SW1A, Canadian FSAs such as M5V, Irish routing keys and full postcodes elsewhere, plus every town of about 1,000 people or more. “Use my location” uses your device’s position instead.
- MET Norway data: MET Norway gives hourly steps for about 2½ days, then 6-hour steps, which we spread across the hours in between. It gives rain amounts but, outside the Nordic countries, no chance of rain, so the chance is estimated from the amount: measurable rain in an hour counts as likely rain. Temperatures show in °C, wind in km/h (mph in the UK) and rain in mm.
- Hourly gridded forecast: your browser asks the NWS for the forecast grid cell covering that point (about 2.5 km across in most of the U.S.) and reads hourly temperature, dew point, relative humidity, wind speed, wind gusts, probability of precipitation and forecast rain amounts (QPF) for the next 7 days.
- Scored in your browser: the rules run in your browser. Forecast data is not routed through our servers, and your ZIP code, postcode or location is not stored. See the privacy policy.
The NWS and MET Norway update their forecasts several times a day, and each forecast shows its source and when it was last updated. Postcode and town search covers every country where Amazon links on this site work: the U.S., Canada, the UK, Ireland and most of Europe.
How Good, Maybe and No are decided
For each day, the forecast tries every start hour inside the project’s work window, for example a 3-hour deck staining job starting between 9 AM and 2 PM, and scores each one:
- No if any required limit is broken: too cold or hot while working, humidity over the maximum, the air within 5°F of the dew point, wind over the maximum, a 50% or higher chance of rain while working, rain likely during the dry period after, or an overnight low below the required minimum.
- Maybe if nothing is broken but something needs watching: temperature, humidity or wind outside the ideal range, a 30–49% chance of rain, a cool night below the recommended minimum, dew likely in the 4 hours after finishing, rain in the hours before (surfaces may be wet), or a forecast that does not yet reach far enough to confirm the curing period.
- Good if every check passes. Neighbouring start times that also pass are joined into one best window, such as “10 AM–5 PM”.
The day shows its best-scoring window and lists every reason, so you can decide whether a Maybe matters for your product. The home page shows the same verdicts for all ten projects in a single 7-day grid.
Temperature while you work and overnight lows
Each project has a required range and an ideal range for the air temperature during the work window, shown in the table above. Below the ideal minimum, coatings dry and cure slowly. Below the required minimum, many products do not form a proper film or bond at all. Above the maximum, they dry before they can level, soak in or bond.
Most damage from cold happens after the work, so several projects also check the lowest temperature in the following hours: 12 hours for deck stain, 8 for exterior paint, 24 for driveway sealer and garage epoxy, 48 and 72 hours for concrete, and a 12-hour freeze check for pressure washing. Surfaces in full sun can be much hotter than the air, and slabs much colder. See surface vs. air temperature.
Dew point spread and condensation risk
For exterior painting, deck staining, garage floor epoxy, caulking and spray painting, the forecast compares the air temperature with the dew point for every hour of the work window. When the gap, the dew point spread, falls below 5°F, moisture can condense on cool surfaces even when it is not raining. That can cause:
- Surfactant leaching in paint: sticky, brown or soapy streaks on fresh latex paint when dew forms before it has cured.
- Epoxy blushing: a greasy, cloudy film on garage floor epoxy and poor adhesion.
- Poor stain penetration: stain that cannot soak into damp wood fibers and peels early.
- Cloudy spray paint: moisture trapped in fast-drying aerosol paint, leaving a milky haze.
For deck stain and exterior paint, the 4 hours after you finish are checked too. If the spread is forecast to drop below 3°F in that time, dew is likely and the day is marked Maybe. The dew point guide shows how to check it yourself.
Relative humidity
High humidity slows the evaporation that water-based paints, stains and sealers need to dry, and makes dew more likely. Deck stain, exterior paint, garage epoxy and spray paint require relative humidity at or below 85% during the work window, and driveway sealer at or below 90%. Paint and epoxy are ideal under 75%, and spray paint under 65%.
Wind, drift and temperature inversions
Wind speeds up drying, blows dust and debris into wet finishes and carries spray off target. Limits range from 10 mph for spray paint and weed killer to 30 mph for concrete. In concrete, wind mainly matters through the evaporation rate below.
For spraying weed killer, wind works both ways. The forecast looks for a steady 3–10 mph breeze with gusts under 15 mph. Stronger wind causes droplet drift onto gardens and neighbors’ plants. Almost calm air, under 3 mph, often means a temperature inversion, where cool air is trapped near the ground and fine droplets can hang and travel unpredictably. Above about 85°F some herbicides, such as ester forms of 2,4-D, can also turn to vapor and move off target, so hot days are marked down. More in best weather to spray weed killer.
Rain before and after: rainfastness and curing time
Rain is checked in three places:
- While you work: a 50% or higher chance in any work hour gives a No, and 30–49% gives a Maybe. Fertilizer, pressure washing and garage epoxy only give a Maybe, at a 60% or higher chance, since rain matters less for them.
- After you finish: each coating needs a number of dry hours: 24 for deck stain and driveway sealer (48 preferred), 12 for exterior paint (24 preferred), 8 for concrete (24 preferred), 6 for caulk (24 preferred), 6 for spray paint (12 preferred) and 6 for weed killer. Rain is “likely” if any hour reaches a 50% chance or if the forecast amounts add up to 0.05 inch or more.
- Before you start: deck stain, paint and driveway sealer look back 24 hours, caulk 12 hours and weed killer 3 hours. Meaningful rain in that time (0.05 inch or more, or a 60% chance) gives a Maybe with a reminder to check the surface is dry. See how long to wait after rain.
Lawn fertilizer works the other way. Granular fertilizer needs to be watered in, so the forecast gives a bonus when 0.1–0.75 inch of rain is expected within 48 hours, warns when more is coming, and marks the day No if 1 inch or more is forecast within 24 hours, which can wash it into storm drains. The chance of rain is the NWS probability of at least 0.01 inch at your location. What a 40% chance of rain means explains it.
Concrete evaporation rate (the Uno equation)
When you pour concrete in hot, dry or windy weather, water can leave the surface faster than bleed water rises from inside the slab. The surface then shrinks and cracks while it is still plastic (plastic shrinkage cracking).
The forecast estimates the evaporation rate for every hour of the pour window with the Uno equation (1998), a formula fitted to the evaporation nomograph in the American Concrete Institute’s hot-weather guide, ACI 305R. It uses air temperature, relative humidity and wind speed, and assumes the concrete is at air temperature:
E = 5 × [(T + 18)2.5 − r × (T + 18)2.5] × (V + 4) × 10−6 kg/m²/hr, with T in °C, r the relative humidity as a fraction and V the wind speed in km/h.
If the rate reaches 1.0 kg/m²/hr (about 0.2 lb/ft²/hr), the threshold ACI 305 uses for precautions, the day is marked Maybe and the verdict suggests windbreaks, fogging, an evaporation retarder or an earlier start. That is why a dry, breezy 80°F day can be riskier for a slab than a still, humid, hotter morning. See pouring concrete in hot or cold weather.
Freeze risk and cold-weather curing
Coatings and sealers cure slowly in the cold, and anything that still holds water can be damaged if it freezes.
- Pouring concrete: a day is marked No if freezing temperatures are forecast within 48 hours of the pour, and Maybe if lows below 40°F are forecast within 72 hours. ACI 306 guidance is to protect concrete from freezing until it reaches about 500 psi, which typically takes about two days in cool weather.
- Sealing a driveway: the temperature must stay at or above 50°F for 24 hours after you finish, the minimum most sealer labels give.
- Garage floor epoxy: No if it drops below 45°F within 24 hours, Maybe below 55°F. Keep the garage door closed overnight.
- Deck stain and exterior paint: No below 40°F within 12 hours (stain) or 35°F within 8 hours (paint), Maybe below 50°F.
- Pressure washing: Maybe if it freezes within 12 hours, because water trapped in wood, concrete cracks, siding or the pump can freeze. See pressure washing in cold weather.
For seasonal limits, read how late in the fall you can stain, paint or seal.
Project-by-project weather rules
Each project has its own forecast page with a 7-day forecast for your ZIP code, tips and recommended gear. These are the rules each one checks.
🪵 Deck staining weather: best temperature to stain a deck and how long it needs before rain
Deck stain has to soak into dry wood and then stay dry and reasonably warm while it sets. Most failures come from damp boards, rain the night after, or evening dew.
- Work window: 3 hours, starting between 9 AM and 2 PM
- Temperature while working: 50–90°F required, ideally 55–85°F
- After you finish: stays at or above 40°F for 12 hours (required)
- After you finish: stays at or above 50°F for 12 hours (recommended)
- Humidity: at most 85%
- Dew point: air at least 5°F above the dew point, with no dew in the 4 hours after
- Wind: at most 15 mph, ideally under 10 mph
- Rain after: no likely rain for 24 hours (ideally 48 hours)
- Rain before: dry for 24 hours so surfaces are dry
Can I Stain My Deck Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Outdoor DIY Weather Timing: How Temperature, Dew and Rain Decide Whether a Project Lasts · Seasonal Outdoor DIY Weather Calendar: What Each Season Is Good For
🖌️ Exterior painting weather: how cold is too cold to paint outside
Latex paint can go on in cooler weather than most people think if the product allows it, but the night after matters as much as the afternoon. Evening dew on fresh paint causes surfactant streaks.
- Work window: 4 hours, starting between 9 AM and 1 PM
- Temperature while working: 35–90°F required, ideally 50–85°F
- After you finish: stays at or above 35°F for 8 hours (required)
- After you finish: stays at or above 50°F for 8 hours (recommended)
- Humidity: at most 85%, ideally under 75%
- Dew point: air at least 5°F above the dew point, with no dew in the 4 hours after
- Wind: at most 15 mph, ideally under 10 mph
- Rain after: no likely rain for 12 hours (ideally 24 hours)
- Rain before: dry for 24 hours so surfaces are dry
Can I Paint Outside Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Outdoor DIY Weather Timing: How Temperature, Dew and Rain Decide Whether a Project Lasts · How Long After Rain Can You Stain, Paint, Seal or Spray?
🧱 Concrete pouring weather: minimum temperature, freeze risk and evaporation
Concrete is checked for the longest period of any project, 72 hours, because freezing before it gains strength can ruin a slab. In heat, the evaporation rate predicts plastic shrinkage cracking better than temperature alone.
- Work window: 4 hours, starting between 6 AM and 12 PM
- Temperature while working: 40–100°F required, ideally 50–90°F
- After you finish: stays at or above 33°F for 48 hours (required)
- After you finish: stays at or above 40°F for 72 hours (recommended)
- Wind: at most 30 mph
- Rain after: no likely rain for 8 hours (ideally 24 hours)
- Evaporation rate: under 0.2 lb/ft²/hr (ACI plastic-shrinkage cracking threshold)
Can I Pour Concrete Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Outdoor DIY Weather Timing: How Temperature, Dew and Rain Decide Whether a Project Lasts · Pouring Concrete in Hot or Cold Weather: What Changes
🛣️ Driveway sealing weather: the 50°F, 24-hour sealcoating rule
Asphalt emulsion sealers cure as water evaporates, which needs warmth and sun. The 24-hour 50°F rule is what usually ends the sealing season in fall.
- Work window: 3 hours, starting between 10 AM and 1 PM
- Temperature while working: 50–95°F required, ideally 60–90°F
- After you finish: stays at or above 50°F for 24 hours (required)
- Humidity: at most 90%
- Wind: at most 25 mph
- Rain after: no likely rain for 24 hours (ideally 48 hours)
- Rain before: dry for 24 hours so surfaces are dry
Can I Seal My Driveway Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Outdoor DIY Weather Timing: How Temperature, Dew and Rain Decide Whether a Project Lasts · Seasonal Outdoor DIY Weather Calendar: What Each Season Is Good For
🌿 Weed killer spraying weather: temperature, wind drift and rainfast time
Systemic weed killers need actively growing weeds, dry leaves and a few dry hours to absorb. Wind that is too strong or too calm both cause drift.
- Work window: 1 hour, starting between 7 AM and 6 PM
- Temperature while working: 45–90°F required, ideally 60–85°F
- Wind: 3–10 mph, gusts under 15 mph
- Rain after: no likely rain for 6 hours
- Rain before: dry for 3 hours so surfaces are dry
Can I Spray Weed Killer Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Seasonal Outdoor DIY Weather Calendar: What Each Season Is Good For · How Long After Rain Can You Stain, Paint, Seal or Spray?
🌱 Lawn fertilizer weather: fertilize before rain, but not before heavy rain
Granular fertilizer works best when light rain waters it in. Heavy rain washes it off the lawn and into storm drains.
- Work window: 1 hour, starting between 7 AM and 6 PM
- Temperature while working: 40–95°F required, ideally 50–85°F
- Wind: at most 20 mph
- Watering in: light rain (0.1–0.75") within 48 h is a bonus; 1"+ within 24 h is a no-go
Can I Fertilize My Lawn Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Seasonal Outdoor DIY Weather Calendar: What Each Season Is Good For · When to Apply Crabgrass Preventer: Soil Temperature, Rain and Timing
💦 Pressure washing weather: cold, freezing nights and wind
Pressure washing itself is tolerant of weather. The risk is water left in wood, cracks and the machine freezing afterward.
- Work window: 3 hours, starting between 9 AM and 3 PM
- Temperature while working: 40–105°F required, ideally 50–95°F
- After you finish: stays at or above 32°F for 12 hours (recommended)
- Wind: at most 25 mph, ideally under 15 mph
Can I Pressure Wash Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Pressure Washing in Cold Weather: How Cold Is Too Cold? · Is Your Deck Dry Enough to Stain? Drop Test and Moisture Meters
🧪 Garage floor epoxy weather: temperature, humidity and dew point
Epoxy is a two-part chemical cure that slows sharply in the cold, and condensation on a cool slab causes blushing and poor adhesion.
- Work window: 3 hours, starting between 9 AM and 1 PM
- Temperature while working: 50–90°F required, ideally 60–85°F
- After you finish: stays at or above 45°F for 24 hours (required)
- After you finish: stays at or above 55°F for 24 hours (recommended)
- Humidity: at most 85%, ideally under 75%
- Dew point: air at least 5°F above the dew point
Can I Epoxy My Garage Floor Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Dew Point for Painting and Staining: Why It Matters and How to Check It · Surface Temperature vs. Air Temperature: Why Your Deck Isn’t What the Forecast Says
🔧 Exterior caulking weather: minimum temperature and dry time
Caulk needs a clean, dry joint to bond to and a few dry hours to skin over. Mild temperatures also keep the joint at a middle width.
- Work window: 2 hours, starting between 9 AM and 4 PM
- Temperature while working: 40–100°F required, ideally 50–90°F
- Dew point: air at least 5°F above the dew point
- Wind: at most 25 mph
- Rain after: no likely rain for 6 hours (ideally 24 hours)
- Rain before: dry for 12 hours so surfaces are dry
Can I Caulk Outside Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · Seasonal Outdoor DIY Weather Calendar: What Each Season Is Good For · How Long After Rain Can You Stain, Paint, Seal or Spray?
🎨 Spray painting weather: best temperature and humidity to spray paint outside
Aerosol paint is thin and dries fast, so humidity, dew and wind affect the finish more than with brushed paint.
- Work window: 1 hour, starting between 9 AM and 5 PM
- Temperature while working: 50–90°F required, ideally 60–85°F
- Humidity: at most 85%, ideally under 65%
- Dew point: air at least 5°F above the dew point
- Wind: at most 10 mph, ideally under 7 mph
- Rain after: no likely rain for 6 hours (ideally 12 hours)
Can I Spray Paint Outside Today? Check the 7-day forecast →
Guides: Best Weather for Outdoor Projects: Temperatures, Rain Times and the Best Day for Every DIY Job · How Hot Is Too Hot to Paint, Stain or Pour Concrete? Heat, Sun and Humidity Limits for Every Outdoor Project · How Long Does Exterior Paint Need Before It Rains? · Dew Point for Painting and Staining: Why It Matters and How to Check It
Accuracy and limits
- The forecast is the limit. The verdicts are only as good as the NWS forecast. The first 1–3 days are the most reliable. Use days 4–7 to plan and check again the evening before.
- Air, not surfaces. The forecast uses air temperature. Wood in full sun can be far hotter, and a concrete slab or metal part can be colder. Check surfaces with an infrared thermometer for epoxy, spray paint and hot-weather staining.
- Microclimates. A shaded north wall, a low spot that collects cold air or a lakeside yard can differ from the 2.5 km grid cell.
- Moisture in the material. The forecast checks recent rain, not the moisture inside wood or concrete. Use the water drop test, a moisture meter or the plastic sheet test from this guide.
- Products differ. These are typical label values. Your product’s label, and local rules for fertilizer and herbicides, come first.
Sources
- National Weather Service API documentation and gridded forecast data (api.weather.gov).
- U.S. Census Bureau ZIP Code Tabulation Area gazetteer files.
- American Concrete Institute, ACI 305R Guide to Hot Weather Concreting and ACI 306R Guide to Cold Weather Concreting.
- Uno, P. J. (1998), “Plastic Shrinkage Cracking and Evaporation Formulas”, ACI Materials Journal.
- Product labels and technical data sheets for exterior paints, deck stains, driveway sealers, garage floor epoxies, sealants, aerosol paints, herbicides and fertilizers.
Who writes and maintains these rules is on the About page. Spotted something that looks wrong for your area or product? Contact us.
Frequently asked questions
What is the best temperature for outdoor painting and staining?
For most exterior latex paint and deck stain, 50–85°F while you work, with the night after staying at or above 50°F. Some low-temperature paints allow 35°F. See the painting rules, the staining rules and the complete outdoor project weather guide.
Where does A DIY Day get its weather data?
From the U.S. National Weather Service (NOAA) API: the hourly gridded forecast for your location, the same data behind weather.gov. Your browser requests it directly. See forecast data.
Why does the forecast check the weather after I finish?
Because most coatings fail while they cure: rain the next morning, dew at dusk, or a freeze two days after a pour. Each project checks a set number of hours after the work window, up to 72 for concrete. The weather timing guide explains why.
What chance of rain is too high for an outdoor project?
The forecast treats 30–49% during a period that must stay dry as a caution (Maybe) and 50% or more as likely rain (No). Measurable rain in the forecast amounts also counts. More in What does a 40% chance of rain mean?
What is the dew point spread and why does it matter?
It is the gap between the air temperature and the dew point. Under about 5°F, moisture can condense on surfaces even without rain, which ruins fresh paint, stain, epoxy and spray paint. See dew point rules and the dew point guide.
How does the forecast predict concrete cracking?
It estimates the surface evaporation rate each hour from temperature, humidity and wind with the Uno formula, a fit of the ACI 305 nomograph, and warns above 0.2 lb/ft²/hr. See the evaporation rate rule and the concrete forecast.
Are these limits the same as my product label?
They are typical label values. Your product can differ, and its label always comes first. If a verdict looks wrong for your product or area, tell us.
How accurate is the 7-day project forecast?
It is as accurate as the National Weather Service forecast it uses: most reliable for the next 1–3 days and less certain for days 4–7. Check again the evening before. How to read an hourly forecast shows what to look at.
Check a forecast
Checks wood and concrete moisture before you stain, paint or pour.
As an Amazon Associate we earn from qualifying purchases.